Phase Line Terminals Length (km) Opening date
Phase I

Line 1 Chinchwad Swargate 16.59 2018
Line 2 Vanaz Ramwadi 14.93 2018
Phase II

Line 3 Deccan Gymkhana Bund Garden 11 2021
Line 4 ASI Hinjwadi 18 2021

 

Phase I

The two routes that have been identified for the first phase are:

Vanaz – Ramwadi, via Deccan Gymkhana, Yerwada (14.9 km, elevated)

Chinchwad – Pimpri – Swargate, via Agriculture college (16.5 km, elevated/underground from Range Hills)

 

Phase II

The second phase of the project will contain two lines and the extension of first phase:

ASI to Hinjawadi via Aundh (18 km elevated)

Deccan Gymkhana to Bund Garden Via Swargate and Race Course (11 km under ground)

Extension of lines from Pimpri-Chinchwad to Nigdi and Swargate to Katraj (11.5 km elevated)

Extension of lines from Aundh to Hinjawadi and Ramwadi to Kharadi Naka (13 km elevated)

Extension of lines from Ramwadi to Viman Nagar Airport (elevated)

 

Future expansion

The following routes and extensions have been proposed:

Agriculture college – Warje via JM road and Karve road (9 km elevated)

Extension from Bund Garden to Vishrantwadi (underground)

Extension from Race Course to Hadapsar (elevated)

Link from Bhosari to Moshi to link with Moshi-Chakan-New Pune International Airport (elevated)