Technical Side

The proposed routes are to be built mostly on elevated rails, with underground routes and extensions to follow in future phases.

The proposed fare structure in 2013–14 is to be a minimum of INR 7 for distances less than 2 km, and a maximum of INR 24 for distances above 30 km.